John@stinemireengineering.com

Call (845)-331-8806

Call Us

Our Location

208 Broadway, Port Ewen, NY 12466

Sabini Climate Controlled Storage Facility



Town of New Windsor, NY
New Storage Building
80,000 sq. ft., 4 stories
The project consists of the design of a four-story steel frame storage building with cast-in-place composite concrete floor systems.